File list

From EWB-UMN
Jump to: navigation, search

This special page shows all uploaded files.

File list
 
First page
Previous page
Last page
Date Name Thumbnail Size Description Versions
11:17, 1 August 2010 ImplementationAug2009Spanish.pptx (file) 6.58 MB Translated version of part of the Power Point for the August 2009 implementation trip 1
12:46, 15 August 2010 MOUEnglish19Jun09.png (file) 362 KB The MOU written up for the Rainwater Harvesting System. 19 June 2009 1
19:50, 12 September 2010 EPANetModel9Sep10.jpg (file) 126 KB The the line sizes of the proposed design as modeled in EPANet. 1
15:23, 17 September 2010 GuatemalanPBTank.png (file)
Error creating thumbnail: Invalid thumbnail parameters
3.08 MB Pressure Break tank design created by a Guatemalan engineer. 1
16:22, 20 September 2010 SG SignedMOUAug2010.pdf (file) 458 KB These are the English and Spanish versions of the MOU's that were given to the COCODE and signed. 1
16:25, 20 September 2010 SG JICAApp.pdf (file) 1.11 MB This the grant application that Rolando acquired from the Japanese Embassy. Text in Spanish. 1
16:29, 20 September 2010 SG 522Aug2010.rtf (file) 2.15 MB August 2010 post assessment report. 1
16:42, 20 September 2010 PBTankGuatemalan.tif (file) 600 KB Pressure Break Tank as designed by a Guatemalan engineer. 1
12:30, 27 September 2010 Sima EcuadorTankDesignNotes.pdf (file) 155 KB This is documentation from the pressure break tanks in Ecuador. It covers tank design, tank placement, form design, and "cast-in" nipples. 1
12:44, 27 September 2010 Sima EcuadorReusableFormWork.pdf (file) 186 KB Documentation from the pressure break tanks constructed in Ecuador. It includes details of the reusable form work used to construct the tanks. 1
17:32, 3 October 2010 Water4WorldTankDesign.pdf (file) 720 KB A document authored by Water for the World. It details some items that should be taken into consideration when constructing a ground concrete tank. Includes site selection, materials list, tank capacity, estimated water consumption, tank design, and esti 1
17:38, 3 October 2010 Water4WorldTankConstruction.pdf (file) 454 KB A document authored by Water for the World. It details some items that should be taken into consideration when constructing a ground concrete tank. It includes a materials needed section and general construction steps. 1
11:43, 10 October 2010 525Pre-ImpInstructions.doc (file) 60 KB EWB USA instructions for completing the pre-implementation report. (As of October 10). 1
11:45, 10 October 2010 525PreImpTemplate.rtf (file) 986 KB EWB USA's template for writing a Pre-Implementation Report. (As of Oct 10, 2010) 1
16:25, 11 October 2010 525TankSpecific.doc (file) 1.25 MB   2
14:02, 13 October 2010 ConcreteMixDesign.pdf (file) 53 KB 3:2:1 Concrete mix design used twice before in Guatemala. “tried and true” concrete mix design that has been used in Guatemala for our last two projects. I calculated and tested this mix design during winter break of my senior year just prior to our 1
14:36, 24 October 2010 ConcreteMixDesign.doc (file) 40 KB Typed up version of Kris Lagnlie's mix design. 1
16:06, 24 October 2010 525ReviewPeterW21Oct2010.doc (file) 134 KB Notes taken by Peter Waugh during the Pre-TAC conference call on the 21st of October 2010. 1
16:23, 25 October 2010 Guate525Oct2010.pdf (file) 7.79 MB Pre-implementation report Phase 1. 17 October 2010 1
11:33, 3 November 2010 PBT1CorrectUnfinalized.jpg (file) 303 KB The correct drawing of the pressure break tank 1. Simajhuleu Phase1. Still needs to be finalized by Adam. 1
12:05, 3 November 2010 LidFormworkHand.pdf (file) 112 KB Hand drawing of the latest formwork design for the pressure break tanks. Simajhuleu Phase 1. 1
11:45, 6 November 2010 UMNGuatemala525TACRevision.pdf (file) 8.14 MB The latest version of the Pre-Imp report submitted a week after the initial pre-imp report. 1
14:53, 24 November 2010 Simplified Tank Sites2 C.21.pdf (file) 108 KB   1
17:55, 23 January 2011 525 2Jan11ConstructionPlan.pdf (file) 5.15 MB The topographic map of Simajhuleu which was provided to the TAC on January 2, 2010. 1
17:57, 23 January 2011 525December19th.doc (file) 4.61 MB 525 pre-implementation report submitted to the TAC on January 2, 2011. 1
17:58, 23 January 2011 SystemDiagram.ppt (file) 1.26 MB System Diagram powerpoint submitted to the TAC January 2, 2011. 1
18:00, 23 January 2011 Distribution Network Final.xls (file) 100 KB Water system calculations submitted to the TAC January 2, 2011. 1
18:01, 23 January 2011 ExistingNetworkTotalHead.xls (file) 72 KB Total head calculations submitted to the TAC January 2, 2011. 1
19:24, 10 February 2011 ConstructionTimeline.doc (file) 28 KB An outline of the construction that will take place on the March 2011 Guatemala implementation. 1
18:05, 18 February 2011 Forming option for PBT.pdf (file) 820 KB Adam (Long Way Home) sketched up a formwork option for the PBTs to be used in the March 2011 implementation. These schematics will require a change in tank and rebar dimensions. 1
18:23, 21 February 2011 522PostAssMay2010.pdf (file) 445 KB 525 Post assessment report for the May 2010 trip 1
15:12, 24 February 2011 SG SignIn Feb2011.pdf (file) 45 KB Attendance sheet for a meeting with the COCODE during the Feb 2011 acquisition trip. 1
15:24, 24 February 2011 SG Felciano Materials Agreement Feb2011.pdf (file) 36 KB The prices that Feliciano agreed to supply on the Feb 2011 acquisitions trip. 1
15:30, 24 February 2011 SG Cost Comparison2 Feb2011.pdf (file) 14 KB Comparing prices on the Feb 2011 acquisition trip to Guatemala 1
15:31, 24 February 2011 SG Cost Comparison3 Feb2011.pdf (file) 19 KB Comparing material pricing on the acquisition trip 1
15:31, 24 February 2011 SG CostComparison Feb2011.pdf (file) 21 KB Feb 2011 Guatemala. Comparing price quotes. 1
15:32, 24 February 2011 SG EmmanuelQuote Feb2011.pdf (file) 103 KB Quote from Miscelanea Emmanuel on Feb 2011 acquisition trip to Guatemala 1
15:32, 24 February 2011 SG FFACSA Quote Feb2011.pdf (file) 28 KB Quote from Miscelanea Emmanuel on Feb 2011 acquisition trip to Guatemala 1
15:33, 24 February 2011 SG FelicianoHotelReceipt Feb2011.pdf (file) 24 KB Receipt for cost of stay at Feliciano's 1
15:34, 24 February 2011 SG MaterialsQuote1 Feb2011.pdf (file) 54 KB Quote from Feb 2011 acquisition trip to Guatemala 1
19:43, 6 March 2011 Thesis-jenna-clarke.doc (file) 9.79 MB Jenna Clarke's thesis from 2009. It covers focus groups that she held with the community of Simajhuleu. 1
19:47, 6 March 2011 IndependentStudyReport FinalFormat.pdf (file) 1.72 MB Nate's summary of our involvement with Simajhuleu. This is a good primer for new members. 1
20:20, 6 March 2011 SG Technical and Social Engineering of Water for Simajhuleu-Draft.pdf (file) 531 KB A draft of Derrick's thesis. 1
20:51, 6 March 2011 SG Travel Info 06Mar2011.docx (file) 19 KB Travel Meeting Summary 1
21:55, 7 March 2011 SG Spring Cost Estimate May 2007.xls (file) 44 KB This is an estimate for the construction of a new springbox and spring line for Simajhuleu. 1
16:34, 10 March 2011 SG Cost Estimate May 2007.xls (file) 44 KB An estimate for a new spring box and spring line. 1
18:21, 4 April 2011 SG Spring Measurements.xlsx (file) 19 KB Spring measurements taken during the May 2011 assessment trip. Includes all three spring line: Panul, Pamumus, and Patziaaq. Inflow, outflow, and overflow data is included along with some calculations based on population. 1
18:23, 4 April 2011 SG DecisionMatrix.xlsx (file) 12 KB A quick 1v1 of several different aspects of the project. May 2011 1
18:25, 4 April 2011 SG SpringRoute.xlsx (file) 366 KB GPS data for May 2011 of the Panul and Pamumus. 1
18:26, 4 April 2011 SG WayPoint Correlation.xlsx (file) 23 KB Correlation of Panul spring line points between John Frieseke and Derrick Passe's GPS units. May 2011 1
First page
Previous page
Last page