==Deliverables==
 
==Deliverables==
* 524 - Preliminary Design. Insert EWB USA Example doc --here--
+
* 524 - Preliminary Design. [[Media:524_ExamplePrelim.pdf | Example]]
 
* 525 - Pre-Implementation Report.
 
* 525 - Pre-Implementation Report.
 
* Drawings
 
* Drawings

Revision as of 14:10, 5 November 2012

Deliverables

  • 524 - Preliminary Design. Example
  • 525 - Pre-Implementation Report.
  • Drawings
    • G-01: Title Sheet
    • G-02: Overall view of dam system
    • G-03: General Notes
    • S-01: Existing conditions - Plan Layout
    • S-02: Demolition/Construction Plan/Phasing
    • S-03: Proposed conditions = plan layout
    • S-04: Elevations
    • S-05: Sections
    • S-06: Details
  • Budget
  • Force calculations
  • Construction plan
    • Water diversion
    • formwork construction

Design

  • Updated: October 15, 2012

Autocad Files

Title block Smple Sheet Dam 3 Drawing. Drawing showing the existing dam.

Structural Basis of design

BOD

Gantt Chart

Gantt Chart

Construcability

Constructability

Retaining Wall

  • Retaining Wall Reference: Document outlining design considerations for a retaining wall.
  • Cantilevered retaining wall design to be added. Need to add .xlsm file support to wiki

Soil Data from August

Soil Data

Estimated Costs

Initial Estimate

  • First Estimate. Spreadsheet for initial estimate of costs for concrete and rebar.
  • Buttress Drawing (dwg). The buttress dimensions as used for the initial estimate. Also names dimensions as used in excel spreadsheet above.
Cost Summary for Buttress
Category Total Cost
Concrete $4690
Rebar $1290
Riprap TBD
Formwork TBD
Other materials TBD
Equipment TBD
Total $5980

References

Notes

  • 20121014 Sketch by Mustafa with callouts from Manuel. Covers rebar spacing calculation and position. Also, mentions moment calcs.