Dams

From EWB-UMN
Jump to: navigation, search

Deliverables

  • 524 - Preliminary Design. (Example). Internal review Nov 29. Submit to EWB-USA Dec 6.
  • 525 - Pre-Implementation Report. (SupplyExample)(RWHExample)
  • Drawings
    • G-01: Title Sheet
    • G-02: Overall view of dam system
    • G-03: General Notes
    • S-01: Existing conditions - Plan Layout
    • S-02: Demolition/Construction Plan/Phasing
    • S-03: Proposed conditions = plan layout
    • S-04: Elevations
    • S-05: Sections
    • S-06: Details
  • Budget
  • Force calculations
  • Construction plan
    • Water diversion
    • formwork construction

Design

  • Updated: October 15, 2012

Autocad Files

Title block Smple Sheet Dam 3 Drawing. Drawing showing the existing dam. Final Drawing Set

PDF Drawing Files

Final Drawing Set Final Water Bypass Drawing Set

Structural Basis of design

BOD

Gantt Chart

Gantt Chart

Construcability

Constructability

Retaining Wall

  • Retaining Wall Reference: Document outlining design considerations for a retaining wall.
  • Cantilevered retaining wall design to be added. Need to add .xlsm file support to wiki

Soil Data from August

Soil Data

Formwork

Estimated Costs

Initial Estimate

  • First Estimate. Spreadsheet for initial estimate of costs for concrete and rebar.
  • Buttress Drawing (dwg). The buttress dimensions as used for the initial estimate. Also names dimensions as used in excel spreadsheet above.
Cost Summary for Buttress
Category Total Cost
Concrete $4690
Rebar $1290
Riprap TBD
Formwork TBD
Other materials TBD
Equipment TBD
Total $5980

References

Notes

  • 20121014 Sketch by Mustafa with callouts from Manuel. Covers rebar spacing calculation and position. Also, mentions moment calcs.