Difference between revisions of "Dam Design & Drawings"

From EWB-UMN
Jump to: navigation, search
m
Line 8: Line 8:
  
 
3. Research wood,stone,aluminum, and steel.
 
3. Research wood,stone,aluminum, and steel.
 +
 +
===Estimated Costs===
 +
* [[Media:SG_LWH_Costs.xls|LWH's Material Cost]].  Material pricing that LWH uses (2011)
 +
* [[Media:Budget_calculator-2.xls|Budget Calculator]]. Price list of almost everything for travel(2009). List compiled by us.

Revision as of 16:09, 1 October 2012

--To-do list for the Summer--

Week of May 29th-

1. Study buttress design

2. Bio-mesh and rip-rap information- Here is a little research article on riprap design and includes an equation to calculate the thickness needed to stop erosion. http://www.usbr.gov/pmts/hydraulics_lab/pubs/PAP/PAP-0790.pdf

3. Research wood,stone,aluminum, and steel.

Estimated Costs